Loraine Condominiums

KBS converted this existing 80 year old, 10-story hotel into an updated, 11-story, 84 unit condominium, including a parking garage and leasable commercial space on the first floor. The scope included abatement, demolition, structural modifications and complete common area interior build-out. The entire facade of the building was also renewed with new windows and significant brick and terra cotta repairs. The project was complete in November of 2004.

Address:
123 West Washington Avenue
Madison, WI

Challenges:
The biggest challenges of this project involved the abatement and demolition. KBS received asbestos surveys during the design development phase. These reports showed a substantial amount of the existing drywall mud to contain over 1.0% asbestos. By DNR and OSHA standards, these materials must be properly abated. By retesting and point counting new samples, KBS documented that the asbestos content was less than 1.0%. and saved the Owner over $300,000. We also removed light ballasts, florescent fixtures, HVAC refrigerants, thermostats and oils. We provided training of demolition personnel to allow removal of lead painted materials in lieu of the very expensive lead paint abatement process.

We removed all interior finishes, partitions, utilities, elevators and equipment. Additionally, we removed the top two floors, the ground floor slab, all stairwells, elevator shafts and a significant amount of floor slab in small areas. By removing the ground floor slab, we are able to insert two floors into the same volume to create adequate parking for the entire project. The top two floors were removed to be reconstructed to allow ceiling heights appropriate for "penthouse" units.

Through our own investigation, KBS uncovered major transfer beams over an existing ballroom that required significant structural modification for the new use.

This entire project was completed in downtown Madison with property lines shared with adjacent buildings, shared alley easements or at the sidewalks. This allowed for little or no site storage. KBS used a materials lift at the inside courtyard so as not to disturb the historic façade, storing materials in areas not disturbed by demolition and  secured street and sidewalk closure permits. KBS infilled the old low courtyard area with 3 levels of cast in place concrete parking decks with a landscaped courtyard deck at 3rd floor and continued a cast in place stairwell and elevator core to the 10th floor.

The entire historic facade was cleaned and salvage brick from the demolished penthouses was used to infill HVAC openings. Terra Cotta coins were replaced or repaired.

Consultants were used for an exterior wall analysis, to determine the best thermal system to avoid damaging the existing building components, by properly managing the dewpoint location. Foil faced insulation was applied directly, taped and foamed top and bottom. Uninsulated 2 ½" steel studs were used to fur out the exterior walls, which provided a place for electrical and served to square the old walls without penetrating the exterior wall vapor barrier.

Layout was done as soon as demolition was completed on each floor. The floors were x-rayed to avoid structural members and provide time for any necessary modifications to accommodate plumbing fixtures. This allowed for accurate layouts before the actual materials were ordered and floors cored.

KBS worked directly with the city to secure necessary permits to allow public occupancy in the model unit for sales purposes and continued to work with the city for staged occupancy during unit completion.

  First Place Condos
  UW Milwaukee Dorm
  Astor Place
  Hildale North Condos and Mixed-Use Development
  Metropolitan Place II
  Marquette University Cramer Hall I-VI
  Completed Projects
  Brew City Restaurant
  202 North Charter St Apts
  Greenway Medical Complex
  American Commons
Lot 12
  Jackson Street Parking Structure
  Northern WI Regional Council of Carpenters Training Facility
  Metropolitan Place
Phase
I
  1522 On the Lake
  Capitol Court/Midtown Center
  WI Heart Hospital Medical Office Building and Parking Ramp
  Loraine Condominiums
  Louise's Italian Cafe
  Sysco Food Services of Easter WI
  Green Lake Conference Center
  10th Addition to 9 Springs WWTP
  Automating Peripherals
  St. Camillus Health Center
  The Kenilworth Building
  Colder's Furniture
  Brillion Iron Works
  Monroe Street Commons
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   

 

   
   

HOME - SERVICES - PROJECTS - ABOUT US - EMPLOYMENT - CONTACT